Big Rapids Products
Big Rapids Products, in Mount Sterling, KY, have worked with MP Kelly several times. The most recent project consisted of a press bay addition to their existing facility. MP Kelly was responsible for the design and construction. The addition included 2 30 ton cranes spanning the full 126ft width of the facility and 2 4000 ton transfer presses. MP Kelly self performed all of the site work, foundations and the installation of the 20ft deep press pit foundations. Overall, the project duration was 6 months from design to finish.